Love our standard products? You can now walk into any White Cap location and walk out with Stella Standard Parts.
close
Understanding the need for visual communication between various departments within the operation, a full-height 8m [26′] laminated glass screen was created between the shop and the office. A combination of compression strut and pre-tensioned cables ensured that tensile forces were not transferred to the roof structure above or the slab below.
Showcasing our easy-to-install Posiglaze system, a dividing barrier was installed between the office and recreation areas. The installation was a simple process of bolting the base shoe to the concrete followed by the installation of the glass which was bolted in place after alignment.
The office is also the showroom for our VUE sliding and bi-folding doors.
Want a hand figuring out your glass hardware needs?
Get in touch.
Walk in and walk out with the parts you need today
to keep your projects moving.